Short Title: Dynamic Loads Last Published:  07/30/21 01:05:31 PM (Central)
Element: Human Factors and Behavioral Performance (HFBP)
Evidence:  Report
Risk Master Logic Diagram:  Diagram
Point of Contact:  Jeffrey Somers
HRP Risk Status: Active [current research ongoing]
Risk Ratings and Dispositions per Design Reference Mission (DRM) Category
DRM CategoriesMission Type and
Duration
OperationsLong-Term Health
LxCRisk Disposition *LxCRisk Disposition *
Low Earth OrbitShort
(<30 days)
3x3Accepted with Monitoring3x3Accepted with Monitoring
Long
(30 days-1 year)
3x3Accepted with Monitoring3x3Accepted with Monitoring
Lunar OrbitalShort
(<30 days)
3x3Accepted with Monitoring3x3Accepted with Monitoring
Long
(30 days-1 year)
3x3Accepted with Monitoring3x3Accepted with Monitoring
Lunar Orbital
+ Surface
Short
(<30 days)
3x4Requires Mitigation3x3Accepted with Monitoring
Long
(30 days-1 year)
3x4Requires Mitigation3x3Accepted with Monitoring
MarsPreparatory
(<1 year)
3x3Accepted with Monitoring3x3Accepted with Monitoring
Mars Planetary
(730-1224 days)
3x4Requires Mitigation3x3Accepted with Monitoring
Note: LxC is the likelihood and consequence rating. The information above was last approved by the Human System Risk Board in 10/2020.
Risk Statement
Given the range of anticipated dynamic loads transferred to the crew via the vehicle, there is a possibility of loss of crew or crew injury during dynamic phases of flight.
Gaps (4)