Aims:
This task will outline AEC device requirements, do a trade study(s) of concepts against the requirements, and provide recommendations for the down-select of a prototype exercise device to test on the International Space Station.
HRP
planned to deliver an exercise device to meet the requirements. The Advanced Twin Lifting and Aerobic System (ATLAS) exercise device was delivered
for consideration during the down-select. Recommendations and
analysis were provided by an independent committee that was formed to evaluate
the devices.
Category:
Study Results
Subcategory:
Customer Requested Study or Analysis
Description:
HRP
delivered the Advanced Twin Lifting and Aerobic System (ATLAS) exercise device
for consideration during the down-select. Recommendations and
analysis were provided by an independent committee that was formed to evaluate
ATLAS and an ESA-developed device (E4D).
ATLAS was not selected therefore the project was closed out following an internal contractor-led CDR.
The ATLAS Engineering Design Unit will be delivered for use in the Russian NEK analog facility. Lessons learned from that use could be incorporated in future designs.